We booked a tour today for January 6th through this site for the Pirate Ship. I put in the dates and chose January as the month but when it printed the receipt out, it showed our arrival date at the hotel as "04/01/07" and the tour date as "06/01/07". Will we have a problem using this for January 6th 2007? I am hoping it is just the Mexican way of writing the dates, but I want to be sure. I sent and e-mail to the administrator Steve, but we are leaving at 5:50 AM on 1/4/07 and I don't have a lot of time left to get this straightened out. Thanks for your help.
You should be fine. I know from looking at stubs from some of our things this past summer, they do dates differently. It is day/mo/yr, so 06/01/07 would be Jan 06, 2007. Hope you enjoy your trip!
Hi Michelle, for some reason I havent received your email, but I can see your booking in the system (res # 51011796-1). I can confirm that your tour is definitely for January 6th and not the 1st June! Have a good one, it's a great trip and one we've done about 7 times!
Thanks for all the replies. The e-mail was returned back to me saying that I had the wrong address for you. I did receive a confirmation e mail for the booking that verifies the correct dates so all is well. Sorry for the confusion. We don't normally take our vacations right after the holidays and I'm a little stressed. I'm really looking forward to lying on the beach and chilling!
Relax, you're almost on vacation! :wink: My email if you need it again is steve@cancuncare.com, if that doesnt seem to work just hit the PM button and send me a private message.