    Thought I would pass this on for those of lucky enough to be on the way soon to TTR. I saw on the face book page that the lobby or conversation bar as some like to call it is having major construction done. The whole area is walled off.
    I guess when you open all year you have to fix things at some point. Hat tip to Paul Green on Facebook for the info and photos
    upload_2019-5-7_17-8-14.png upload_2019-5-7_17-9-51.png upload_2019-5-7_17-10-39.png upload_2019-5-7_17-11-12.png upload_2019-5-7_17-11-50.png upload_2019-5-7_17-12-32.png
     
    • Informative Informative x 2
    • List
  2. yelrico

    yelrico Enthusiast Registered Member

    Joined:
    Feb 17, 2013
    Messages:
    47
    Likes Received:
    67
    Location:
    Connecticut
    Ratings:
    +77 / 0
    I was there last week. The floor tile buckled. Should be fixed in a week or two
     
    • Dislike Dislike x 1
    • Agree Agree x 1
    • List
  3. mexico24

    mexico24 Guru Registered Member

    Joined:
    Aug 1, 2013
    Messages:
    702
    Likes Received:
    725
    Location:
    Great plains
    Ratings:
    +1,165 / 3
    Hope it’s done in 33 days and 22 hours.:)
     
  4. MandEOntario

    MandEOntario Addict Registered Member

    Joined:
    Jan 16, 2012
    Messages:
    255
    Likes Received:
    2,282
    Location:
    West of Toronto; Empty nesters with a hot tub
    Ratings:
    +2,674 / 4
    How could this reno happen already, given the new construction/renos only 18 mths or so ago?
    Hmmmm... wondering if maybe the recent takeover group or single guys are somehow behind this ??? :) kidding!
     
    • Funny Funny x 9
    • Like Like x 1
    • Agree Agree x 1
    • Winner Winner x 1
    • List
    Last edited: May 7, 2019
  5. Emman

    Emman Regular Registered Member

    Joined:
    Feb 2, 2019
    Messages:
    126
    Likes Received:
    269
    Location:
    DFW
    Ratings:
    +305 / 0
    Yep. Spot on.
     
  6. Stacia_and_John

    Stacia_and_John T&A Tour Guide Registered Member

    Joined:
    Mar 1, 2012
    Messages:
    4,338
    Likes Received:
    3,034
    Location:
    Houston, TX
    Ratings:
    +4,620 / 14
    We were there 1st week of May when they were actually starting the job, putting up the plasteen sheeting so they could start the demo.


    FYI - the general worker bees are not told anything, apparently. I got three different stories from bar staff, housekeeping and restaurant servers. Oh, yeah... butlers too. So, four stories actually.

    One was the tile buckled...so there ya go. Next was that management decided to get rid of the tile that was so slick... which seemed kind of arbitrary to me considering they opted to put it in in the first place, so if it wasn't otherwise faulty I don't see them removing it. Another reason was that there was a water leak that was creeping under the tiles on that floor, between the concrete slab which makes up the underfloor (no clue), and the last was that they are starting a redocration of the lobby bar area, and starting witht he tile floor.
     
  7. BandLus2

    BandLus2 Regular Registered Member

    Joined:
    Sep 13, 2015
    Messages:
    235
    Likes Received:
    325
    Location:
    USA Ohio
    Ratings:
    +393 / 0
    We just got home on 29th. It seemed to be done. Added a wheelchair ramp out to Bash from lobby. They are also starting renos in Bash tower. Could see workers in room's scraping the walls. Our tower room had the floor starting to hump up. All we needed was some paint and we could have played twister.
     
  8. Stacia_and_John

    Stacia_and_John T&A Tour Guide Registered Member

    Joined:
    Mar 1, 2012
    Messages:
    4,338
    Likes Received:
    3,034
    Location:
    Houston, TX
    Ratings:
    +4,620 / 14
    Wonder what causes the floors to hump up?

    Any constructo-types here with a possible explanation?
     
  9. Restling

    Restling I can choose my own title Registered Member

    Joined:
    Dec 30, 2012
    Messages:
    1,612
    Likes Received:
    818
    Ratings:
    +1,635 / 4
    Don’t know the actual cause, but rushed shotty work seemed to be the way this project was carried out from the start.

    Lol, is here anything about the Reno you can really say they got right? Pools too deep and cold, raised dance floor in Bash divides the room, and makes the bar side cramped, chairs around sexy pool suck, chairs pretty, much, around any of the bars suck, and not much about the bathrooms in the older sections work real well.

    I will say they managed to find a really loud sound system for Bash, and apparently a volume knob that goes to 11, and besides it all I’ll still keep coming back.
     
  10. PardonTheFun

    PardonTheFun Regular Registered Member

    Joined:
    Mar 8, 2014
    Messages:
    185
    Likes Received:
    587
    Location:
    Shreveport, LA (USA)
    Ratings:
    +696 / 0
    98% chance that buckling damage to the tile was in one way or another caused by moisture. A water leak between the tile and subfloor could cause failure and buckling, depending upon what kind of adhesive was used in the installation. Therefore, a water leak, causing the tile to buckle made management take a hard look at the slick tile and decided to put something safer, in a different color, therefore making all four explanations given to @Stacia_and_John in effect ALL probably near accurate.
     