    I still think it is 7 storeys as per their website:

    Untitled-1.jpg

    Let's do the math.

    From 1st Jan (a week or so after vertical construction started) until Aug 15 there are 225 days.

    During the first 90 days (40% of the time) they have done lets say 4.5 of the 7 storeys (65% of the work). This includes the two lowest floors which have much more structure than those above. Let's allow for that and say 70% of the work is done.

    So, they have 60% of the time remaining to complete 30% of the construction.
     
    • Like Like x 3
    • Agree Agree x 3
    • List
  2. Ron Colpitts

    Ron Colpitts Newbie Registered Member

    Joined:
    Feb 21, 2017
    Messages:
    6
    Likes Received:
    3
    Ratings:
    +8 / 0
     
  3. Ron Colpitts

    Ron Colpitts Newbie Registered Member

    Joined:
    Feb 21, 2017
    Messages:
    6
    Likes Received:
    3
    Ratings:
    +8 / 0
    Steve,

    I am with you and staying very optimistic. We have booked Aug 25th thru the 3rd of Sept. Purely from a business standpoint I believe that they will have the majority of the work done and at the least the main venues open. They need to start making money again. Garden room Tower room whats the difference the magic happens at the pool and the night clubs and defiantly on the Boobs Cruise ( ready to book as soon as the dates are open). I will have fun no matter what, and I am not going to stress out over the small details. Cancun or Bust.

    Ron
     
    • Agree Agree x 4
    • Like Like x 3
    • List
  4. Donna & Tim

    Donna & Tim I can choose my own title Registered Member

    Joined:
    Jun 3, 2015
    Messages:
    3,112
    Likes Received:
    1,070
    Location:
    NW Connecticut
    Ratings:
    +1,605 / 6
    [​IMG]

    I'm not sure how Karim Rashid or Mexico counts stories of buildings but around here generally anything that is above the ground level with a roof over head is considered a story. If this picture is a true rendering and to to scale I'm counting 10 stories. I know for some other countries the ground level floor is floor # zero and this would make the tower 9 stories or floors. It really doesn't matter just get it done in time for the reopening.

    T
     
  5. Steve

    Steve Administrator Owner

    Joined:
    Feb 14, 2003
    Messages:
    17,466
    Likes Received:
    4,979
    Location:
    Cancun
    Ratings:
    +7,261 / 14
    If it is 10 storeys then the math is revised as follows:

    From 1st Jan (a week or so after vertical construction started) until Aug 15 there are 225 days.

    During the first 90 days (40% of the time) they have done lets say 4.5 of the 10 storeys (45% of the work). This includes the two lowest floors which have much more structure than those above. Let's allow for that and say 50% of the work is done.

    So, they have 60% of the time remaining to complete 50% of the construction.
     
  6. Steve

    Steve Administrator Owner

    Joined:
    Feb 14, 2003
    Messages:
    17,466
    Likes Received:
    4,979
    Location:
    Cancun
    Ratings:
    +7,261 / 14
  7. Donna & Tim

    Donna & Tim I can choose my own title Registered Member

    Joined:
    Jun 3, 2015
    Messages:
    3,112
    Likes Received:
    1,070
    Location:
    NW Connecticut
    Ratings:
    +1,605 / 6
    The 3000 building looks a little drafty without the windows and doors but that could come in handy with the upcoming room crawls.

    T
     
  8. Jen&Kyle

    Jen&Kyle I can choose my own title Registered Member

    Joined:
    Jan 12, 2010
    Messages:
    5,473
    Likes Received:
    4,105
    Location:
    Pennsylvania
    Ratings:
    +6,397 / 12
    The end of the new building sure looks a lot closer to the beach than I thought it would be. Makes sense making those rooms the ocean front lush tower rooms maybe??? Versus the bash tower ocean view rooms which are set further back??? Just a guess
     
  9. halifaxdan

    halifaxdan I can choose my own title Registered Member

    Joined:
    Mar 19, 2008
    Messages:
    1,682
    Likes Received:
    42
    Location:
    Halifax NS Canada
    Ratings:
    +49 / 2
    They have 50% of the structure (concrete slabs n columns) done. Not any finishes which in my experience takes more time
     
    • Like Like x 1
    • Agree Agree x 1
    • List
  10. Donna & Tim

    Donna & Tim I can choose my own title Registered Member

    Joined:
    Jun 3, 2015
    Messages:
    3,112
    Likes Received:
    1,070
    Location:
    NW Connecticut
    Ratings:
    +1,605 / 6
    I hope they were planning on some elevators in the tower area otherwise there are going to be many people crashing in the stairways.

    T
     
    Last edited: Mar 30, 2017
Thread Status:
Not open for further replies.
  1. This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
    By continuing to use this site, you are consenting to our use of cookies.
    Dismiss Notice