Just got back from TTR after 9 nights...all was good..again! except for 3 things... 1. I wish they would mop the gym floor everyday.. 2. At the outside patio there are 2 long tables and several small ones... would love to have one of the tables a non smoking table... 3. there were several spots on the buildings that were in need of some red paint, it was peeling really bad.. definitely an eye soar..
1,,, good idea 2,,, last Nov the smoke was so bad we called it an early almost every night. They have talked about installing some fans. 3,, last Nov they were painting the outside,,, must be defective paint ??
Re: #3, they were painting the exterior at the end of September too (apologies to the Mexican workman standing on the balcony when I drew the curtains, at least I was wearing boxers but I did scare him lol). I'm sure the sun and heat is brutal on paint but it should last a little longer than a few months. It was red paint they were using too as the drop clothes looked like the scene of a massacre lol
And there's nothing to say that the spots where it was coming off are the same ones that they painted last year.
True. It's probably kinda like painting the Golden gate bridge, you finish and start again at the beginning.